VA TECH WABAG Secures ‘Large’ Order from BWSSB for Wastewater Treatment Facilities

VA TECH WABAG LIMITED (WABAG) has announced the successful securing of a ‘Large’ order from the Bangalore Water Supply and Sewerage Board (BWSSB). The contract involves the Design, Build, and Operate (DBO) of two energy-efficient wastewater treatment facilities: a 100 MLD Sewage Treatment Plant (STP) and a 25 MLD Tertiary Treatment Plant (TTP) at Byramangala, along with a 60 MLD STP at Bellandur. This significant project aims to bolster Bengaluru’s water infrastructure and promote sustainable water management.

‘Large’ Order Awarded by BWSSB

VA TECH WABAG LIMITED (‘WABAG’), a prominent player in the multinational water technology sector, has been awarded a substantial ‘Large’ order by the Bangalore Water Supply and Sewerage Board (BWSSB). This significant contract is for the development of two crucial energy-efficient wastewater treatment facilities in Bengaluru. The announcement was made on July 20, 2026.

Project Details and Scope

The order encompasses the Design, Build, and Operate (DBO) of a 100 MLD Sewage Treatment Plant (STP) and a 25 MLD Tertiary Treatment Plant (TTP) to be located at Byramangala. Additionally, WABAG will construct a 60 MLD STP at Bellandur. The scope includes comprehensive Design, Engineering, Procurement, Construction, and Commissioning (EPC) for these facilities, which will also feature biogas-based power generation. The STPs will implement the Activated Sludge Process with a Biological Nutrient Removal system, while the TTP will utilize Ultrafiltration to produce high-quality treated water suitable for distribution.

Strategic Significance and Timeline

This project is set to significantly strengthen Bengaluru’s wastewater treatment capabilities and water infrastructure, addressing the challenges posed by rapid urbanization. WABAG has previously executed the first phase of the Bellandur facility and will now undertake the second phase. The EPC scope is slated for completion within 36 months, followed by a 7-year Operations and Maintenance (O&M) period. The facilities are designed to incorporate anaerobic sludge digestion for biogas-based power generation, aiming to reduce GHG emissions, lower energy footprint, and enhance operational efficiency and resource recovery.

Company’s Outlook and Market Position

Mr. S. Natrajan, Vice President & Head – Sales and Marketing, India Cluster, commented that securing these wins reinforces WABAG’s leadership in India’s municipal wastewater treatment sector and its commitment to sustainable water infrastructure. The energy-efficient facilities with biogas integration are expected to establish a scalable model for resource recovery and circularity. The order falls under the ‘Large’ classification, indicating an inflow value between INR 250 to 600 Crores.

Source: BSE

Previous Article

Vedant Fashions Limited Board Meeting Scheduled for July 25, 2026, to Approve Un-audited Financial Results

Next Article

Ajanta Pharma Board Meeting Scheduled for July 30, 2026, to Approve Q1 Financial Results