Diamond Power Infrastructure Limited Commissioning of New 7th MV/EHV Production Line

Diamond Power Infrastructure Limited has successfully commissioned its 7th MV/EHV Power Cable Production Line at its Vadodara manufacturing facility. Utilizing advanced Continuous Catenary Vulcanisation (CCV) technology, the company has expanded its manufacturing capacity by 150 kms per month. This strategic investment of Rs 55 crore is designed to meet the growing market demand for high-quality power cables, further strengthening the company’s production capabilities and operational footprint in the energy infrastructure sector.

Strategic Expansion at Vadodara Facility

Diamond Power Infrastructure Limited has marked a significant operational milestone by commissioning a new production line at its advanced manufacturing site in Vadodara, Gujarat. This 7th MV/EHV (Medium Voltage/Extra High Voltage) line is built upon the latest Continuous Catenary Vulcanisation (CCV) technology, which is critical for ensuring superior quality and reliability in power transmission cables.

Capacity and Investment Details

The addition of this production line increases the company’s output capacity by 150 kms per month, building upon its existing capacity of 900 kms per month. The project involved a total capital investment of Rs 55 crore, which was funded entirely through internal accruals, reflecting a strong commitment to self-sustained growth and operational excellence.

Driving Future Growth

Prior to this commissioning, the facility was operating at a capacity utilization rate of 60%. This expansion is directly aimed at capitalizing on the increasing demand for specialized power products in the energy sector. By integrating this new technology, Diamond Power is well-positioned to enhance its service delivery and address the evolving needs of its infrastructure clients.

Source: BSE

Previous Article

Devyani International Limited Board Announces Leadership Changes and Internal Audit Reappointment

Next Article

Jain Irrigation Systems Ltd Financial Results for Quarter and Year Ended March 31, 2026