POWERGRID has announced the successful commissioning of the Khavda II-C Transmission Limited project. This initiative, secured through Tariff Based Competitive Bidding, involves an Inter-State Transmission System focused on evacuating 4.5GW of Renewable Energy (RE) injection at Khavda PS. The project, under Phase-II, Part C, became fully operational effective January 31, 2026, enhancing POWERGRID’s infrastructure for renewable energy transmission.
Khavda Transmission Project Operational
POWERGRID has successfully commissioned the Khavda II-C Transmission Limited project. This project is a key element in strengthening India’s renewable energy infrastructure.
Project Details
The Khavda II-C Transmission Limited project, secured through Tariff Based Competitive Bidding, facilitates the evacuation of 4.5GW of Renewable Energy (RE) injection at Khavda PS under Phase-II, Part C. The project’s successful commissioning, effective January 31, 2026, marks a significant step in enhancing interstate transmission capabilities for renewable energy.
Source: BSE