Bharat Heavy Electricals Limited Secures NTPC Order for Darlipali STPP Stage-II

Bharat Heavy Electricals Limited (BHEL) has received a Notification of Award (NOA) from NTPC Limited for the 1×800 MW Darlipali STPP, Stage-II. The EPC contract is valued at over ₹6,650 Crore (excluding GST). The project involves the design, engineering, supply, erection, and commissioning of equipment along with civil works. The completion timeline is set for 48 months from the date of notification.

NTPC Award Notification

Bharat Heavy Electricals Limited (BHEL) announced the receipt of a Notification of Award (NOA) from NTPC Limited for the 1×800 MW Darlipali Super Thermal Power Project (STPP) Stage-II.

Project Details

The order, received on November 6, 2025, encompasses an EPC (Engineering, Procurement, and Construction) package. The project site is located in the Sundargarh district of Odisha. This is a domestic project.

Scope of Work

The project scope includes:

  • Design
  • Engineering
  • Supply of Equipment
  • Erection & Commissioning
  • Civil Works

Financial Details

The broad consideration or size of the order is over ₹6,650 Crore, excluding GST.

Project Timeline

The Completion of Facilities (COF) is scheduled within 48 months from the date of the Notification of Award (NOA).

Related Party Transactions

The announcement clarifies that both BHEL and NTPC are Central Public Sector Enterprises (CPSEs) and the transaction is not considered a related party transaction and is carried out at arm’s length.

Source: BSE

Previous Article

Akzo Nobel India Investor Presentation Highlights Q2 2025-26 Performance

Next Article

PNB K.G. Ananthakrishnan's Tenure as Non-Executive Chairman Ends

Write a Comment

Leave a Comment

Your email address will not be published. Required fields are marked *