Bharat Heavy Electricals Limited (BHEL) has received a Notification of Award (NOA) from NTPC Limited for the 1×800 MW Darlipali STPP, Stage-II. The EPC contract is valued at over ₹6,650 Crore (excluding GST). The project involves the design, engineering, supply, erection, and commissioning of equipment along with civil works. The completion timeline is set for 48 months from the date of notification.
NTPC Award Notification
Bharat Heavy Electricals Limited (BHEL) announced the receipt of a Notification of Award (NOA) from NTPC Limited for the 1×800 MW Darlipali Super Thermal Power Project (STPP) Stage-II.
Project Details
The order, received on November 6, 2025, encompasses an EPC (Engineering, Procurement, and Construction) package. The project site is located in the Sundargarh district of Odisha. This is a domestic project.
Scope of Work
The project scope includes:
- Design
- Engineering
- Supply of Equipment
- Erection & Commissioning
- Civil Works
Financial Details
The broad consideration or size of the order is over ₹6,650 Crore, excluding GST.
Project Timeline
The Completion of Facilities (COF) is scheduled within 48 months from the date of the Notification of Award (NOA).
Related Party Transactions
The announcement clarifies that both BHEL and NTPC are Central Public Sector Enterprises (CPSEs) and the transaction is not considered a related party transaction and is carried out at arm’s length.
Source: BSE
