POWERGRID has announced the successful commissioning of a critical infrastructure project: the “Transmission System for Power Evacuation from Arun-3 (900 MW) HEP, Nepal – Indian Portion.” This achievement was finalized effective September 3, 2023. The announcement was made on March 27, 2026, in compliance with ongoing regulatory disclosures, confirming the successful integration of the power evacuation system linking the 900 MW hydropower project in Nepal to the Indian grid.
Project Commissioning Confirmed
POWERGRID has formally confirmed the successful commissioning of a vital power transmission project connecting the Arun-3 (900 MW) Hydro Electric Project (HEP) in Nepal. Specifically, the transmission system dedicated to the “Indian Portion” of the power evacuation has been brought online.
Effective Date and Compliance
The commissioning took effect on September 3, 2023. This notification is being made today, March 27, 2026, to satisfy disclosure requirements related to key operational milestones.
Regulatory Framework
This update adheres to the disclosure mandates outlined under Regulation 30 of the relevant listing regulations. Furthermore, the commissioning is in line with the terms specified in the CERC (Terms and Conditions of Tariff) Regulations, 2019, referencing the CERC Order dated March 10, 2026.
Source: BSE