NTPC Green Energy Limited (NGEL) has announced the commencement of commercial operations for a 9.9 MW wind project located in Bhuj, Gujarat, effective September 24, 2025. This project is part of a larger 92.4 MW (Wind) capacity initiative. With this addition, the total installed capacity of NGEL Group will increase to 7382.475 MW.
Wind Project Commences Operations
NTPC Green Energy Limited’s (NGEL) joint venture project, ONGC NTPC Green Private, is now commercially operational, effective September 24, 2025. This development contributes to NGEL’s growing renewable energy portfolio and aligns with its commitment to sustainable power generation.
Project Details and Capacity
The project, located in Bhuj, Gujarat, involves a 9.9 MW Wind capacity. This is part of a larger initiative with a total installed capacity of 92.4 MW (Wind), undertaken by Ayana Renewable Power Four Private Limited, a subsidiary of Ayana Renewable Power Pvt. Ltd. The addition of this 9.9 MW capacity will increase the total installed capacity of the NGEL Group.
Impact on Total Capacity
The current commercial capacity of NTPC Green Energy Limited Group stands at 7372.575 MW. With the addition of the newly operational project, the total installed capacity of the NGEL Group is set to increase to 7382.475 MW. This further solidifies NTPC’s commitment to expanding its green energy footprint.
Source: BSE