Rail Vikas Nigam Limited RVNL-GPT JV Lowest Bidder for Northern Railway Project

RVNL-GPT JV has emerged as the Lowest Bidder (L1) for a Northern Railway project involving the design and construction of a new Rail Cum Road Bridge over the river Ganga. The project, valued at ₹12,01,35,69,000, includes the construction of a bridge near Kashi Railway Station. The project encompasses a bridge with specific dimensions (8 X 108.5 m + 2 X 103.3 m Open Web Steel Girder) designed for four rail lines and a six-lane road.

Project Award Overview

Rail Vikas Nigam Limited (RVNL) has announced that the joint venture RVNL-GPT JV has been identified as the Lowest Bidder (L1) for a significant project with Northern Railway. This project underscores RVNL’s ongoing commitment to expanding and enhancing railway infrastructure.

Project Details

The project involves the design and construction of a new Rail Cum Road Bridge No. 11 over the river Ganga, situated 50 meters downstream of the existing old Malviya Bridge, near Kashi Railway Station. Key components include:

  • Substructure and superstructure of the Bridge (8 X 108.5 m + 2 X 103.3 m Open Web Steel Girder)
  • Four line tracks on the lower deck
  • Six-lane road on the upper deck
  • Railway and Road approaches compliant with GAD standards
  • Associated OHE Works and General Electric works within the Lucknow Division of Northern Railway at Varanasi, Uttar Pradesh

Financial and Structural Details

The total project cost is ₹12,01,35,69,000 (Rupees Twelve Hundred One Crore Thirty-Five Lakh Sixty-Nine Thousand Only), including all taxes. The shareholding in the joint venture is as follows:

  • Rail Vikas Nigam Ltd.: 60%
  • GPT Infraprojects Ltd.: 40%

Project Timeline

The project is expected to be completed within 48 months.

Source: BSE

Previous Article

Larsen & Toubro Outcome of Board Meeting on January 28, 2026

Next Article

LT Foods Interim Dividend Declared and Board Approves Financial Results