NTPC Green Energy Arm Commissions 6.6 MW Wind Capacity

NTPC’s subsidiary, NTPC Green Energy Limited (NGEL), has declared the Commercial Operation Date (COD) for a part capacity of 6.6 MW (Wind) of a 100 MW hybrid project in Bhuj, Gujarat, effective December 11, 2025. This capacity addition increases the total installed capacity of the NTPC group to 84,931 MW and the NGEL group to 7645.675 MW.

Wind Energy Milestone

NTPC Green Energy Limited (NGEL), a subsidiary of NTPC, has announced the commissioning of part capacity from its hybrid renewable energy project. The 6.6 MW wind component, part of the larger 100 MW project, achieved its Commercial Operation Date (COD) on December 11, 2025.

Project Details and Location

The wind capacity is located in Bhuj, Gujarat, and is being developed by Ayana Renewable Power Four Private Limited, a subsidiary of Ayana Renewable Power Pvt. Ltd. Ayana Renewable Power Pvt. Ltd. is wholly owned subsidiary of ONGC NTPC Green Private Limited.

Capacity Update

With this commissioning, the total installed and commercial capacity of the NTPC group now stands at 84,931 MW. The NTPC Green Energy Limited Group’s capacity is increased to 7645.675 MW with the addition of this capacity.

Source: BSE

InvestyWise News
InvestyWise News
Covers market-moving news with speed and precision, delivering sharp insights to help readers stay ahead in the fast-paced world of stocks.

Latest articles

Related articles

Leave a reply

Please enter your comment!
Please enter your name here
Captcha verification failed!
CAPTCHA user score failed. Please contact us!