NTPC Green Energy: 56.7 MW Wind Capacity Begins Commercial Operation

NTPC Green Energy Limited has declared two wind energy projects operational: 6.3 MW at Nakhatrana, Gujarat, and 50.4 MW at Jamjodhpur, Gujarat. These additions bring the group’s current commercial capacity to 10,920.53 MW, with the total installed capacity now reaching 10,977.23 MW. Both projects are part of the 500 MW REMCL RTC Project and commenced operations on September 22, 2026.

New Wind Energy Projects Operational

NTPC Green Energy Limited has announced the commencement of commercial operations for two significant wind energy projects. The projects are located in Gujarat and mark an expansion of the company’s renewable energy portfolio. The official declarations signify an increase in the company’s operational capacity and its contribution to renewable energy generation.

Project Details and Capacity Additions

The first project, located at Nakhatrana in Kutch, Gujarat, has a capacity of 6.3 MW. This is part of a larger 1050 MW wind component under the 500 MW REMCL RTC Project of NTPC Renewable Energy Limited. It was declared operational effective 00:00 hrs on September 22, 2026.

The second project, situated at Jamjodhpur in Jamnagar, Gujarat, has a capacity of 50.4 MW. This also forms part of the 1050 MW wind component under the 500 MW REMCL RTC Project of NTPC Renewable Energy Limited. This project commenced commercial operations effective 00:00 Hrs on September 22, 2026.

Impact on Total Capacity

With these new additions, the current commercial capacity of the NTPC Green Energy Limited group has risen to 10,920.53 MW. Consequently, the total installed capacity of the NTPC Green Energy Limited group has increased to 10,977.23 MW, further strengthening its position in the renewable energy sector.

Source: BSE

Previous Article

Thomas Cook India: Ratings Reaffirmed by CRISIL

Next Article

Syngene International: Head of Corporate Affairs Resigns